Method

Five sheets over one another.

We do not start with atmosphere. We start with the ground and the water.

Sheet 05 · layers

Construction is a stack of drawings.

Each phase lays a sheet over the last. Nothing becomes visible before the layer beneath it is right.

On-site survey: the existing garden is measured and inspected

Level · borehole · afternoon sun

On site: levels, a soil borehole, existing drains, afternoon shade. You say how the garden is used. We write down what the plot will allow.

01

Introduction and survey

On site: levels, a soil borehole, existing drains, afternoon shade. You say how the garden is used. We write down what the plot will allow.

02

Sketch and garden design

One or two plans to scale. Paths, levels, trees, hard surfaces. No collage. A section when the change in height matters.

03

Material and planting plan

Tiles, timber, steel, joint, a plant list with sizes. Samples on the table. Only then a price you can compare.

04

Earthworks and construction

Demolition, removal, sand, drainage, paving, timber, water, plants last. The order is fixed: what belongs under the tile goes in before the tile.

05

Handover and maintenance

A walk with the plan in hand. Agreements for the first growing season. Defects we put right; slow growth is not a defect.